The main structure of the car park has a total of 8 floors, which adopt single-entry and single-exit mode, entering from Qingfeng Road and exiting Fenghuang Avenue. There are four entrances in total. The computerized control system can automatically park after parking at the entrance to the parking system.
When you enter the territory of the intelligent parking lot, you will see that it is a parking equipment made of a steel frame structure and uses a carriageway paving technology. The transporter robot can directly transport the vehicle, move the vehicle to each designated location through the lift, and then move the vehicle horizontally to the designated parking space.
The smart parking lot now has 272 mechanical parking spaces. The most advanced intelligent parking equipment and PLC control system can provide auto parking and auto lift. Thanks to the 3D parking technology, fast driving can be realized. The vehicle enters and exits the mechanized parking system in 90 seconds.
The automated smart garage project is expected to be completed in August and operational in October, greatly alleviating the parking problems of the surrounding people and creating an intelligent, efficient and green business card for Shangrao.
Hydro-Park 1027
Hydro-Park 1120
Hydro-Park 1123
Hydro-Park 1127
Hydro-Park 1132
Hydro-Park 2136
Hydro-Park 2236 & 2336
Hydro-Park 4127
Hydro-Park 5120
Starke 1127 & 1121
TPTP-2
SPP-2
SAP
FPP-2 & 2L
FPP-2T
Hydro-Park 2525 & 2625
Hydro-Park 2725
Hydro-Park 3130
Hydro-Park 3230
Hydro-Park 3320
Starke 2127
Starke 2227
Starke 2327
Starke 3121 & 3127
Hydro-Park 7220
PFPP-2 & 3
BDP-1
BDP-2
BDP-3
BDP-4
BDP-5
BDP-6
BDP-1+1
ARP Series
ATP Series
MLP Series
MSSP Series
CTP Series
HSP Series
FP-VRC
S-VRC
S-VRC-2
CTT